Most cities were not designed to handle the current climate and environmental challenges. So how can we help our cities become more climate resilient while better securing water resources?
How can we help our cities become more climate resilient while better securing water resources?

Hilton Hotel Development, Bournemouth

Effective Wavin Water Retention System Prime Solution Mitigates Flooding and Supports Green Space in Bournemouth Development.

Key Takeaways

Challenging Terrain Managed

Wavin's Water Retention System Prime geocellular stormwater management unit effectively addressed the complex challenge of controlling surface water and potential floodwater on a challenging slope for the ambitious Hilton Hotel Development in Bournemouth.

Versatile Solution

Over 600 Wavin Water Retention System Prime units were used to create a 4,240f³ cellular attenuation tank, designed to manage surface water run-off from the 13-story hotel, Hampton by Hilton complex, apartments, and underground car park, showcasing the unit's versatility and capacity.

Innovative Installation

Wavin Water Retention System Prime units were installed at varying depths and cleverly clipped together to create a stepped, two-tiered tank, demonstrating innovative design and installation techniques to accommodate the sloping site.

Streamlined Integration

The integration of Wavin's drainage solutions, including Osma UltraRib and OsmaDrain pipes, facilitated a swift and efficient installation process, essential for a large-scale project like the Hilton Hotel Development.

Enhanced Resilience

The successful implementation of the drainage system enhanced the development's resilience against weather challenges, ensuring longevity, comfort, and safety for guests and stakeholders, and setting a precedent for effective stormwater management in challenging environments.

The Problem

The ambitious $82 million Hilton Hotel Development in Bournemouth posed a significant challenge - controlling surface water and potential floodwater on a challenging slope. With the development encompassing a 13-story 5-star Hotel, 8-story Hampton by Hilton complex, 45 apartments, and a 3-story underground car park, the project required an exceptionally versatile solution to manage excessive surface water run-off and withstand continuous car usage and the weight of the construction. 

The Solution

When faced with this demanding task, the contractor, McAleer and Rushe Group, turned to Wavin's drainage solutions. The Wavin Water Retention System Prime geocellular stormwater management unit emerged as the ideal solution for the development. With over 600 Wavin Water Retention System Prime units specified for the project, a 4,240f³ cellular attenuation tank was created below a restaurant, terrace, and entrance café area to effectively manage surface water.

bournemouth-problem-1
bournemouth-problem-2

To address the challenge of the sloping site, the Wavin Water Retention System Prime units were installed at varying depths of 1.2m to 1.6m and cleverly clipped together to form a stepped, two-tiered tank. Above the detention tank, a concrete slab was installed for the completion of the café terrace. Additionally, Wavin provided Osma UltraRib 225mm and 300mm structured wall pipes, along with OsmaDrain 160mm drainpipes to handle both foul and surface water drainage.

The Impact

By utilizing Wavin's Water Retention System Prime and other drainage solutions, the Hilton Hotel Development in Bournemouth gained multiple benefits. Beyond effectively managing excessive rainfall in the long term, the Wavin Water Retention System units showcased their proven lateral and vertical loading performance, ensuring resilience in challenging load-bearing environments. The seamless integration of Wavin's products allowed for a swift and streamlined installation process, proving essential for one of the largest drainage schemes undertaken by McAleer and Rushe Group. 

bournemouth-impact-1
bournemouth-impact-2

The successful implementation of the drainage system provided peace of mind for the project stakeholders, ensuring the development's longevity, and enhancing its resilience against the unpredictable nature of weather and water challenges. With a reliable stormwater management solution in place, the Hilton Hotel Development stood ready to welcome its guests with utmost comfort and safety.